PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed electrical split wire above the ceiling for the 2nd floor ENL Facing North.jpg Installed electrical split wire above the ceiling for the 2nd floor ENL Facing West.jpg Installed misc. duct work at the 1st floor Facing East.jpg Installing motorized damper controllers at the 2nd floor Facing South.jpg Started connecting copper piping to the 2nd floor  VAV Boxes Facing West (2).jpg Started connecting copper piping to the 2nd floor  VAV Boxes Facing West.jpg Copper piping at the 4th floor Facing East.jpg Exterior metal framing at the 2nd floor Facing North.jpg Installing duct work at the 4th floor Facing North.jpg
Previous pageNext page Started connecting copper piping to the 2nd floor  VAV Boxes Facing West (2)
Started connecting copper piping to the 2nd floor VAV Boxes Facing West (2)